Resources

Frequently asked questions.

Straight answers to the questions we hear most from DFW homeowners before they start a project with us.

How do I know if I need a repair or replacement?

The honest answer depends on the age of the material, the extent of damage, and whether the underlying structure is sound. A repair makes sense when damage is localized. A full replacement is typically warranted when more than 30% of a surface is compromised, when the substrate is failing, or when repair cost approaches 50% of replacement cost.

How long does a project typically take?

A covered patio or concrete work runs 2–5 weeks from permit to final walk. A full outdoor kitchen with structure runs 5–8 weeks. A full backyard transformation can run 8–14 weeks. Roofing replacements are typically 2–5 days. We give you a written schedule at contract signing.

Do you offer warranties?

Yes. Every Integris project includes a written workmanship warranty. Material warranties from manufacturers pass through to you separately. We don't offer verbal warranties — everything is in writing.

Do you offer financing?

We work with a small number of preferred financing partners for qualified projects. Ask during your quote consultation and we'll share current options. We don't mark up financing.

Are you licensed and insured?

Yes. Integris Builds holds an active Texas general contractor license and carries general liability and workers' compensation insurance. We can provide certificates of insurance at any time.

What areas do you serve?

We serve the full Dallas–Fort Worth Metroplex, including Plano, Frisco, McKinney, Allen, Southlake, Keller, Grapevine, Irving, Arlington, Fort Worth, Denton, Lewisville, and surrounding cities. We also take select projects in Austin, Waco, and other Texas markets.

How does the 3D Studio quote process work?

Use the 3D Outdoor Living Studio to sketch your space and drop in structures and finishes. Save your design and share it with us before the site visit. The studio doesn't replace the site walk — dimensions and grading have to be confirmed in person — but it shortens the back-and-forth on scope.

Can I use my own materials or appliances?

Yes, with conditions. We can install owner-supplied appliances as long as they're compatible and received in advance. For structural materials, we typically source our own to ensure quality and warranty continuity.

What is your process for HOA approvals?

We handle HOA submissions as part of the permitting phase on applicable projects. We prepare the drawings, specs, and application, and we track the approval.

Do you build in phases?

Yes. We design projects with future phases in mind when we know that's the direction — running conduit and stubs during the first phase so the second one doesn't require demo.

Have a question we didn't answer?

Call or send a message and someone on the team will get back to you the same day.